Mt Lyell Materials Handling Refurbishment Study

Project Scope

Sibanye Stillwater (formally New Century Resources) engaged MCA Engineering to undertake a comprehensive condition assessment and engineering upgrade study for the Mt Lyell Copper Mine in Tasmania. The objective was to determine the viability of recommissioning the operation and to quantify the investment required to modernise the entire underground materials handling and hoisting system.

Between 2023 and 2025, MCA Engineering delivered a multi-disciplinary study covering materials handling, shaft infrastructure, hoisting systems, civil and SMP interfaces, and long-term asset replacement planning.

Work With Us

MCA offer a wide range of services including concept design studies, detailed design, fabrication and construction. For more information, please contact us to discuss how we can assist you with your next project.

Overview

Year: 2023–2025

Client, Project, Location:
Sibanye Stillwater, Materials Handling Refurbishment Study, Mt Lyell Copper Mine in Tasmania

Contract Value: $1.1 million