MCA Engineering delivered a shaft refurbishment project for a mine in Regional NSW, installing a 24m headframe, two 1200 Mine Class winders (SIL 2 control), a working stage and cage for men and materials. The upgrade equipped the client’s number one shaft to a depth of 1,200m, increasing hoisting capacity across the site.