Project Scope

MCA Engineering was engaged to design a lowering system to install the PC2-3 Ore Pass.

MCA designed and installed a Chain Jack System. This system built upon a previous design MCA successfully implemented in 2013/2014.

All design and fabrication occurred at the MCA Parkes facility.

Both jobs were a major success with great feedback from the clients. We intend to use the Chain Jack System for many other projects in the future.

Project Downloads
Work With Us

MCA offer a wide range of services including concept design studies, detailed design, fabrication and construction. For more information, please contact us to discuss how we can assist you with your next project.

Overview

Year: 2022

Client, Project, Location:
Newcrest, Cadia Ore Pass, Cadia East Mine, Orange NSW

Contact Type: Fixed

Role: Subcontract

Contract Value: $2.1 million